US 180 Bridge Construction

Palo Pinto, Texas

Description :

The US 180 Dry Creek Bridge replacement project includes the demolition of the existing bridge, installation of gabion baskets for erosion control, construction of a new bridge, and asphalt paving of the surrounding roads. These improvements aim to enhance safety, traffic flow, and durability of the infrastructure.

Project Value : $ 1.8 million