Sidewalk T-1 Improvements
Murphy, Texas
Description :
The project includes 700’ of concrete and asphalt trail between S. Maxwell Creek Road and McCreary Road and a 2 – 8’ x 8’ box culvert low water crossing of Maxwell Creek with wingwalls and apron.
Murphy, Texas
The project includes 700’ of concrete and asphalt trail between S. Maxwell Creek Road and McCreary Road and a 2 – 8’ x 8’ box culvert low water crossing of Maxwell Creek with wingwalls and apron.